Industry: Petroleum
Function: Corporate Services
|
|
|
| New reserves
New trends and prospects |
1 million barrel of reserves additions net to the Company/year.
30%50% overall success rate on wildcat drilling. Average of 1 economically successful major prospect/year. Team and VP Exploration are satisfied that the amount of effort matches the potential. |
| Seismic interpretation | VP Exploration is satisfied that:
Data is analyzed correctly. Data is integrated with all the subsurface information. All the data are used. Map matches the interpretation. Meets agreed-upon deadline. |
| Subsurface interpretation
Log analysis
Volumetric maps Surface maps Isopach maps |
Management says they are satisfied that:
Seismic data ties together. Log correlations look reasonable and are integrated into seismic interpretations. All the available data is used and fits the interpretations. Fits engineering data. Looks beyond known producing horizons. Interpretations identify new opportunities. Meets agreed-upon deadline. Management agrees that time spent matches the potential and the results. Exceeds = >50% of the recommendations match the results. Other team members are satisfied that the interpretation: Integrate all relevant data. Makes a decision.
Other team members are satisfied that the maps: Have contours that match the structural and net sand maps. Are consistent with the reservoir and seismic data. Wildcat well information matches the maps. |
| Log correlation and zone identification | Geologist and other team members are satisfied that the correlations and zones:
Differentiate between structural and stratigraphic effects. Are consistent with all available data. Met agreed-upon deadline. |
| Drill well objectives and design criteria | VP Exploration, Operations Manager and Drilling Engineer are satisfied that the:
Formation objectives are clearly identified. Evaluation procedures fit the region and are cost-effective. Well parameters are accurate. |
| Risk assessment | Team Leader says risk looks realistic based on appropriate weighting of all the available data. |
| Reserves estimate | VP Exploration is satisfied that the subsurface, seismic and nearby production data agree.
Exceeds = Actual well reserves match predictions. |
| Completed projects | Work isnt held up waiting for answers.
Geophysicist offers useful ideas or information without being asked. Schedule is met. Exceeds = Comes in ahead of schedule and within ± 10% budget. |
| Seismic data acquisition, processing and modeling | VP Exploration is satisfied that the data enhances probability of success or quality of interpretation:
Method of collection saves money. Increases quality of data, which makes the decision clearer. |